The Solution
A temporary over-pump system was installed to divert wastewater and sewerage flows into the TerraTank setup, creating robust buffer storage with multiple tanker loading points for streamlined flow control. A fleet of 25 tankers were strategically coordinated in continuous rotation, maintaining uninterrupted operation of the wastewater network, avoiding downtime or disruption to the surrounding residential area.
With the pump station fully isolated, all gate valves and non-return valves (NRVs) were swiftly replaced and commissioned, without compromising network integrity, despite site access constraints.