A client who operates in the hospitality sector running a large glamping complex reached out to us after identifying issues with the functionality of their built-in sewage treatment system, just as they approached their peak operating season.
They had established that their sewage tanks required repair work to keep them usable. However, they also needed to keep the waste treatment system running at full capacity or run the risk of having disgruntled customers on their hands.
Treloar rapidly delivered 4 TerraTank TX3-70 tanks to site, connected together with a manifold pipework layout. The rectangular footprint of the bulk liquid storage tanks enabled them to be placed in a compact, space-saving configuration.
With a combined capacity of 280,000 litres provided by the 4 TerraTanks, the repair work to the on-site sewage tanks was able to proceed with minimal disruption to normal operations and importantly, their clients were able to enjoy the same quality experience as they normally would.
©2024 Treloar Ltd. All rights reserved.
Please enter your email address to join our industry newsletter. By downloading you are agreeing to the terms of our Privacy Policy